Painting Metal Roof - Pemayetv Emahakv Charter School
Project using Chem-Bake 1-Step (1201) to restore a metal roof.
FirstChoice Professional Painting restored the school’s 10,000-sq-ft metal roof awning in Okeechobee, FL using Chem-Bake 1-Step (1201).
Overview
Pemayetv Emahakv Charter School’s metal roof showed chalking and color loss. Goals: match custom color, restore appearance, and reduce future maintenance by using a product with high fade-resistance.
Challenges
- Severe chalking reduced adhesion potential.
- Custom color match required to align with school branding.
- Short weather window; needed low-odor, fast recoat.
Process
- Pressure-wash and scrub to remove chalk and grime.
- Address surface issues where needed.
- Paint two test patches to verify adhesion and dry times.
- Apply two coats of Chem-Bake 1-Step (1201) via airless sprayer.
- Work performed over 2 days (72–80°F, low wind).
Products & Methods
- Used Zap-It! to break down stubborn chalk prior to coating.
- Tinted Chem-Bake 1-Step (1201) to the approved custom color.
- Sequenced work by roof sections to maintain schedule and safety.
Results
The roof achieved a uniform finish with improved gloss. Owner reported satisfaction with job results.
Coverage and flow were excellent. The team finished faster than expected.