FirstChoice Professional Painting restored the school’s 10,000-sq-ft metal roof awning in Okeechobee, FL using Chem-Bake 1-Step (1201).

 

Overview

Pemayetv Emahakv Charter School’s metal roof showed chalking and color loss. Goals: match custom color, restore appearance, and reduce future maintenance by using a product with high fade-resistance.

Challenges

  • Severe chalking reduced adhesion potential.
  • Custom color match required to align with school branding.
  • Short weather window; needed low-odor, fast recoat.

Process

  • Pressure-wash and scrub to remove chalk and grime.
  • Address surface issues where needed.
  • Paint two test patches to verify adhesion and dry times.
  • Apply two coats of Chem-Bake 1-Step (1201) via airless sprayer.
  • Work performed over 2 days (72–80°F, low wind).

Products & Methods

  • Used Zap-It! to break down stubborn chalk prior to coating.
  • Tinted Chem-Bake 1-Step (1201) to the approved custom color.
  • Sequenced work by roof sections to maintain schedule and safety.

Results

The roof achieved a uniform finish with improved gloss. Owner reported satisfaction with job results.

Coverage and flow were excellent. The team finished faster than expected.

— First Choice Painting — Project Lead